LOT 8 & 9/17 Allora Avenue, Ferntree Gully, VIC 3156
Ferntree Gully 珍稀大地 16336㎡ 建筑规划许可 尽享Dandenong Ranges美景 毗邻繁华购物中心 BUILD YOUR DREAM HOME WITH BREATHTAKING VIEWS
联系中介把握难得的机会,在Ferntree Gully中心地带拥有一块约16,336平方米的大片土地。该地块已获得地方政府批准的建筑规划和许可,用于建设Allora Oasis Estate——一个包含15座房屋的开发项目。每个地块面积约为520平方米,为您未来的家提供了完美的基础。
地处高处,这个优越的位置提供了令人惊叹的全景,俯瞰Lysterfield起伏的山丘,融合了宁静的自然美景和附近便利设施的便捷。仅需数分钟车程,您将到达Dandenong Ranges National Park,标志性的1000 Steps,Upper Ferntree Gully火车站,以及最近翻新的Westfield Knox购物中心。这个一站式购物目的地拥有Kmart,Target,Coles,Woolworths,ALDI,Harris Scarfe,一个Village Roadshow电影院,以及提供时尚,餐饮,娱乐和健康选择的各种商店。
建筑工程已于2025年1月启动,预计交房时间在未来12至18个月。
LOT 8 & 9/17 Allora Avenue, Ferntree Gully, VIC 3156
BUILD YOUR DREAM HOME WITH BREATHTAKING VIEWS
Open by inspection from Monday to Friday
Fully serviced and level blocks
Terms: 10% Deposit
Seize this incredible opportunity to secure a part of a large 16,336sqm (approx.) parcel of land in the heart of Ferntree Gully. With council-approved plans and permits in place for the Allora Oasis Estate – a 15-house development – each allotment, starting at 520sqm (approx.), offers a perfect foundation for your future home.
Nestled atop an elevated site, this prime location provides stunning panoramic views across the rolling Lysterfield hills, blending serene natural beauty with the convenience of nearby amenities. Just minutes away, you'll find the Dandenong Ranges National Park, the iconic 1000 Steps, Upper Ferntree Gully Train Station, and the recently updated Westfield Knox shopping centre. This one-stop shopping destination features Kmart, Target, Coles, Woolworths, ALDI, Harris Scarfe, a Village Roadshow cinema, and a variety of stores offering fashion, dining, entertainment, and wellness options.
Current Construction Progress Update by 20/7/2025.
✔ Water/Stormwater/Sewer Pipeline Works Completed.
The installation of stormwater and sewer pipelines has progressed smoothly, and all piping work is now substantially complete.
✔ Electrical and Gas Pipeline Works Completed
Gas and electricity pipeline installations have been fully completed, laying a solid foundation for the next stages of construction.
✔ Retaining Wall Structure Fully Completed
All retaining walls on site have been installed, using a combination of precast concrete panels and H-beams. This efficient solution accommodates varying land elevations and significantly enhances foundation stability, laying a solid groundwork for future residential construction.
✔Power Infrastructure Installation Completed
Underground electrical conduits have been laid, with red and blue conduits, power pillars, and relevant safety signage now in place. This sets a solid foundation for upcoming municipal power connection and electrical integration.
✔Land Levelling and Site Access Cleared
Excavation, backfilling, and levelling have been completed across multiple sections. Access paths are now clear, allowing for the smooth entry and exit of machinery. The overall construction environment continues to improve and upgrade
The land registration is expected September 2025.